Floor Grinding and Polish Work at Tex World Knitwear Limited

Construction worker in orange safety vest and face mask using a large floor grinding machine on a dusty surface under an industrial ceiling.
Interior of a building under construction with a concrete floor, metal beams, and large windows, some of which have protective metal grates.
Construction worker inside a dusty, unfinished industrial building with brick walls and a metal roof.
Construction worker in safety vest working on wet concrete floor inside a building under construction.

Client: Tex World Knitwear Limited,

Duration: 30th May 2022 to 20th June 2022

AKSID Corporation Limited has working this project 15000 sft.

15000 sft factory area using liquid floor hardener Sikafloor Curehard 24 for densifying and increasing the strength of old concrete floor.